1 00:00:32,870 --> 00:00:30,040 [Music] 2 00:00:35,060 --> 00:00:32,880 the highlight this report period was the 3 00:00:37,850 --> 00:00:35,070 successful flight of the fourth Saturn 4 00:00:42,139 --> 00:00:37,860 1b launch vehicle using the overall 5 00:00:44,479 --> 00:00:42,149 flight designation of Apollo 5 the SI 6 00:00:47,770 --> 00:00:44,489 204 launch vehicle had been on the pad 7 00:00:50,510 --> 00:00:47,780 at KSC for approximately 18 months 8 00:00:52,610 --> 00:00:50,520 during this time period corrosion and 9 00:00:55,069 --> 00:00:52,620 electrical inspections were conducted as 10 00:00:59,029 --> 00:00:55,079 well as a complete operational system 11 00:01:03,020 --> 00:00:59,039 safety review the Apollo 5 space vehicle 12 00:01:07,940 --> 00:01:03,030 a s 204 LM 1 was launched on January 13 00:01:11,750 --> 00:01:07,950 22nd 1968 liftoff was scheduled at 1900 14 00:01:15,080 --> 00:01:11,760 GMT with one six-hour built in hold at t 15 00:01:18,230 --> 00:01:15,090 3:30 or true rest and unscheduled work 16 00:01:21,410 --> 00:01:18,240 an unscheduled hold of three hours and 17 00:01:24,620 --> 00:01:21,420 48 minutes duration occurred at t 2:30 18 00:01:26,749 --> 00:01:24,630 because of two problems one hour 28 19 00:01:28,789 --> 00:01:26,759 minutes of this hold was attributed to 20 00:01:30,710 --> 00:01:28,799 ground support equipment associated with 21 00:01:33,890 --> 00:01:30,720 a spacecraft environmental control 22 00:01:36,200 --> 00:01:33,900 system and the remaining hold period was 23 00:01:43,510 --> 00:01:36,210 attributed to failure of a power supply 24 00:01:49,810 --> 00:01:46,490 liftoff was at 5:48 p.m. Eastern 25 00:01:52,819 --> 00:01:49,820 Standard Time from complex 37b 26 00:01:55,940 --> 00:01:52,829 engineering evaluation of the a s 204 27 00:01:58,910 --> 00:01:55,950 Saturn 1b launch vehicle the final R&D 28 00:02:00,859 --> 00:01:58,920 vehicle in the 1b program indicates that 29 00:02:03,340 --> 00:02:00,869 all the primary and secondary mission 30 00:02:06,200 --> 00:02:03,350 objectives were successfully achieved 31 00:02:10,660 --> 00:02:06,210 this launch vehicle performed closer to 32 00:02:12,740 --> 00:02:10,670 nominal than any Saturn vehicle to date 33 00:02:13,640 --> 00:02:12,750 primary launch vehicle mission 34 00:02:15,110 --> 00:02:13,650 objectives 35 00:02:18,050 --> 00:02:15,120 evaluation of the launch vehicle 36 00:02:21,530 --> 00:02:18,060 attitude control system and maneuvering 37 00:02:24,009 --> 00:02:21,540 capability verification of s4b liquid 38 00:02:28,369 --> 00:02:24,019 hydrogen and oxygen tank pressurization 39 00:02:30,619 --> 00:02:28,379 characteristics demonstration of nose 40 00:02:32,420 --> 00:02:30,629 cone separation and evaluation of 41 00:02:34,699 --> 00:02:32,430 operational adequacy of the launch 42 00:02:37,059 --> 00:02:34,709 vehicle systems including guidance 43 00:02:40,130 --> 00:02:37,069 control electrical mechanical and 44 00:02:42,470 --> 00:02:40,140 instrumentation minor performance 45 00:02:44,509 --> 00:02:42,480 deviations were noted and action is 46 00:02:47,899 --> 00:02:44,519 being taken to prevent these in future 47 00:02:50,000 --> 00:02:47,909 vehicles because of the combined success 48 00:02:53,270 --> 00:02:50,010 of both launch vehicle and lunar module 49 00:02:58,509 --> 00:02:53,280 hardware the backup mission of a s 206 50 00:03:04,309 --> 00:03:02,000 all other Saturn 1b stages are on or 51 00:03:06,410 --> 00:03:04,319 ahead of schedule highlighting the 52 00:03:09,440 --> 00:03:06,420 booster stages activity during this 53 00:03:13,640 --> 00:03:09,450 quarter was the static testing of s 1b 54 00:03:16,129 --> 00:03:13,650 11 at MSFC as a result of combustion 55 00:03:19,250 --> 00:03:16,139 stability tests on R&D engines at the 56 00:03:20,930 --> 00:03:19,260 neo show test facility it had been 57 00:03:22,490 --> 00:03:20,940 determined that test facility 58 00:03:26,960 --> 00:03:22,500 characteristics could contribute to 59 00:03:28,819 --> 00:03:26,970 undamped engine instability in order to 60 00:03:31,189 --> 00:03:28,829 determine the influence of the s 1b 61 00:03:34,280 --> 00:03:31,199 stage structure on h1 engine combustion 62 00:03:36,680 --> 00:03:34,290 stability the Chrysler Corporation was 63 00:03:40,670 --> 00:03:36,690 directed in late December to perform 64 00:03:42,229 --> 00:03:40,680 engine stability tests on s1 b11 using R 65 00:03:44,990 --> 00:03:42,239 and D engines and BOM induced 66 00:03:49,580 --> 00:03:45,000 instability to determine stage damping 67 00:03:51,710 --> 00:03:49,590 characteristics the first test went for 68 00:03:54,800 --> 00:03:51,720 the full 15 second direction January 69 00:03:58,039 --> 00:03:54,810 25th using one R and D engine for the 70 00:03:59,659 --> 00:03:58,049 test the peak pulse lasted less than 4 71 00:04:05,629 --> 00:03:59,669 milliseconds which was considered 72 00:04:08,809 --> 00:04:05,639 satisfactory to R&D engines were bombed 73 00:04:13,300 --> 00:04:08,819 in the next test on February 6 damping 74 00:04:21,740 --> 00:04:15,710 testing on February 14th gave 75 00:04:24,170 --> 00:04:21,750 essentially the same data the fourth 76 00:04:26,510 --> 00:04:24,180 was terminated after three seconds due 77 00:04:28,850 --> 00:04:26,520 to a failure and fire in the gearcase of 78 00:04:33,170 --> 00:04:28,860 engine number eight which was not under 79 00:04:36,410 --> 00:04:33,180 bomb testing this failure was thoroughly 80 00:04:39,200 --> 00:04:36,420 investigated by MSFC and the contractors 81 00:04:41,270 --> 00:04:39,210 concerned cause of the failure was 82 00:04:44,060 --> 00:04:41,280 attributed to gross leakage of locks 83 00:04:46,970 --> 00:04:44,070 past the lock seal in the h1 engine 84 00:04:49,310 --> 00:04:46,980 locks pump the leakage was attributed to 85 00:04:51,950 --> 00:04:49,320 either a broken carbon seal or a failure 86 00:04:55,670 --> 00:04:51,960 of the caliphs lip seal during engine 87 00:04:57,590 --> 00:04:55,680 start as a result of the failure MSFC is 88 00:05:00,170 --> 00:04:57,600 planning to test both lip seal and 89 00:05:03,650 --> 00:05:00,180 bellows type seals in static tests 90 00:05:05,780 --> 00:05:03,660 during April based on test data from 91 00:05:08,330 --> 00:05:05,790 these future tests determination will be 92 00:05:11,870 --> 00:05:08,340 made as to which type seals will be used 93 00:05:14,240 --> 00:05:11,880 on 205 further as a result of this 94 00:05:16,220 --> 00:05:14,250 failure the decision was made to install 95 00:05:18,820 --> 00:05:16,230 temperature measurement instrumentation 96 00:05:21,320 --> 00:05:18,830 in the locked seal cavity drain lines 97 00:05:23,060 --> 00:05:21,330 this measurement will be interlocked to 98 00:05:25,610 --> 00:05:23,070 launch control to guard against this 99 00:05:28,040 --> 00:05:25,620 failure mode components of the 100 00:05:31,250 --> 00:05:28,050 configuration measurement system will be 101 00:05:34,640 --> 00:05:31,260 tested on s1 b11 and the full system 102 00:05:40,130 --> 00:05:34,650 will be tested on s1 b12 and will be 103 00:05:42,670 --> 00:05:40,140 installed on a s 205 the status of other 104 00:05:46,130 --> 00:05:42,680 s 1b stages is as follows 105 00:05:48,680 --> 00:05:46,140 s1 b5 the first scheduled man Saturn 106 00:05:51,890 --> 00:05:48,690 flight booster was shipped from issue on 107 00:05:56,510 --> 00:05:51,900 March 25th and arrived at the KSC Saturn 108 00:06:00,530 --> 00:05:56,520 dock March 28th as of the end of the 109 00:06:02,030 --> 00:06:00,540 quarter s 1b stages 6 8 9 10 and 12 were 110 00:06:06,860 --> 00:06:02,040 in storage at the Michoud assembly 111 00:06:10,310 --> 00:06:06,870 facility modifications started in 112 00:06:13,310 --> 00:06:10,320 January on s1 b7 in preparation for the 113 00:06:15,800 --> 00:06:13,320 206 207 dual launch rendezvous mission 114 00:06:18,710 --> 00:06:15,810 if such a mission is required for the 115 00:06:20,090 --> 00:06:18,720 Apollo program several components have 116 00:06:23,030 --> 00:06:20,100 been removed during the quarter for 117 00:06:28,159 --> 00:06:23,040 updating electrical power was applied to 118 00:06:31,310 --> 00:06:28,169 the stage March 15 the status of the 119 00:06:33,640 --> 00:06:31,320 second or s4b stages of the Saturn 1b as 120 00:06:35,660 --> 00:06:33,650 of the end of the quarter is as follows 121 00:06:37,880 --> 00:06:35,670 s4 B 205 122 00:06:40,760 --> 00:06:37,890 completed post storage tests and check 123 00:06:46,510 --> 00:06:40,770 out during the quarter shipment to KSC 124 00:06:54,980 --> 00:06:51,920 s4b stages 206 207 208 and 209 are in 125 00:06:57,200 --> 00:06:54,990 storage at Sacto stages 210 and two 126 00:07:02,600 --> 00:06:57,210 eleven are in storage at Huntington 127 00:07:04,160 --> 00:07:02,610 Beach s4b 212 presently designated as 128 00:07:06,530 --> 00:07:04,170 the stage for use in the orbital 129 00:07:11,030 --> 00:07:06,540 workshop mission was undergoing Apollo 130 00:07:13,640 --> 00:07:11,040 modification work during the quarter the 131 00:07:17,000 --> 00:07:13,650 s4b orbital workshop mock-up was shipped 132 00:07:22,880 --> 00:07:17,010 to MSFC by a super guppy from McDonnell 133 00:07:25,070 --> 00:07:22,890 Douglas on January 16 1968 extensive 134 00:07:26,900 --> 00:07:25,080 crew station and documentation reviews 135 00:07:29,630 --> 00:07:26,910 were conducted on the workshop mock-up 136 00:07:32,630 --> 00:07:29,640 during this period taking part in these 137 00:07:34,460 --> 00:07:32,640 reviews were several astronauts the 138 00:07:36,650 --> 00:07:34,470 astronauts were well satisfied with the 139 00:07:38,420 --> 00:07:36,660 mock-up and their participation in the 140 00:07:41,120 --> 00:07:38,430 reviews allows incorporation of 141 00:07:44,450 --> 00:07:41,130 operational aspects into the design in a 142 00:07:46,460 --> 00:07:44,460 timely and efficient manner evaluation 143 00:07:49,160 --> 00:07:46,470 of data resulting from the review is 144 00:07:52,100 --> 00:07:49,170 continuing at the end of the quarter 145 00:07:55,010 --> 00:07:52,110 approximately 285 engineering drawings 146 00:07:57,020 --> 00:07:55,020 of a total of 1100 have been released 147 00:08:00,170 --> 00:07:57,030 for the orbital workshop modification 148 00:08:03,970 --> 00:08:00,180 kit workshop modifications are scheduled 149 00:08:06,770 --> 00:08:03,980 to start early in the next quarter 150 00:08:10,490 --> 00:08:06,780 Saturn 1b instrument unit status and 151 00:08:13,190 --> 00:08:10,500 progress is as follows SIU 205 has 152 00:08:15,470 --> 00:08:13,200 completed modifications and is scheduled 153 00:08:19,880 --> 00:08:15,480 for shipment to KSC early in the next 154 00:08:24,980 --> 00:08:19,890 quarter Saturn 1b instrument units 155 00:08:28,720 --> 00:08:24,990 numbers 206 207 208 209 and 211 are in 156 00:08:32,000 --> 00:08:28,730 storage at IBM's Huntsville facility I 157 00:08:34,490 --> 00:08:32,010 you 210 after a month and a half in 158 00:08:37,190 --> 00:08:34,500 temporary storage reentered assembly in 159 00:08:39,950 --> 00:08:37,200 early february at the close of the 160 00:08:44,780 --> 00:08:39,960 report period satisfactory progress was 161 00:08:47,600 --> 00:08:44,790 being made in assembly operations due to 162 00:08:49,430 --> 00:08:47,610 the long lead time for IU 212 no 163 00:08:53,540 --> 00:08:49,440 activity was scheduled for 164 00:08:55,760 --> 00:08:53,550 this period progress on storage 165 00:08:58,240 --> 00:08:55,770 enclosures for all stages has been very 166 00:09:01,970 --> 00:08:58,250 satisfactory during this report period 167 00:09:05,000 --> 00:09:01,980 initial tests performed at MSFC on the 168 00:09:07,000 --> 00:09:05,010 s-1 b enclosure indicated this type of 169 00:09:09,980 --> 00:09:07,010 protection would be satisfactory 170 00:09:12,230 --> 00:09:09,990 following testing production of the s-1 171 00:09:15,890 --> 00:09:12,240 b enclosures was initiated by the 172 00:09:18,200 --> 00:09:15,900 Technical Services office at MSFC the 173 00:09:20,240 --> 00:09:18,210 first production storage enclosure was 174 00:09:23,390 --> 00:09:20,250 completed late in the report period a 175 00:09:27,890 --> 00:09:23,400 total of seven s1 t enclosures will be 176 00:09:29,810 --> 00:09:27,900 produced and shipped to masu during this 177 00:09:31,820 --> 00:09:29,820 period a change order was issued to 178 00:09:33,970 --> 00:09:31,830 McDonnell Douglas to cover design 179 00:09:37,190 --> 00:09:33,980 fabrication and installation of 180 00:09:42,790 --> 00:09:37,200 protective enclosures for 8s 4b second 181 00:09:46,190 --> 00:09:42,800 stages may 31st completion was specified 182 00:09:48,410 --> 00:09:46,200 meanwhile IBM is already designed tested 183 00:09:50,690 --> 00:09:48,420 and initiated procurement of protective 184 00:09:53,780 --> 00:09:50,700 storage enclosures for 1b instrument 185 00:09:56,720 --> 00:09:53,790 units the IBM enclosure is a reusable 186 00:09:59,740 --> 00:09:56,730 container made of a water vapor barrier 187 00:10:02,120 --> 00:09:59,750 plasticized non flammable material a 188 00:10:05,390 --> 00:10:02,130 mechanical compression type closure is 189 00:10:07,670 --> 00:10:05,400 used to affect final sealing to control 190 00:10:09,530 --> 00:10:07,680 humidity conditions the enclosure is 191 00:10:11,900 --> 00:10:09,540 purged and desiccants absorb the 192 00:10:14,390 --> 00:10:11,910 moisture the desiccants are replaced 193 00:10:16,820 --> 00:10:14,400 every 30 days or as required 194 00:10:18,800 --> 00:10:16,830 since the IU's are stored in an 195 00:10:21,770 --> 00:10:18,810 air-conditioned area no temperature 196 00:10:23,780 --> 00:10:21,780 control is required this container is 197 00:10:28,370 --> 00:10:23,790 designed to effectively protect a unit 198 00:10:30,950 --> 00:10:28,380 for up to three years present plans are 199 00:10:33,580 --> 00:10:30,960 the Thistle Saturn wonderly found early